Skip to main content
At a limited-access residential site in New York, the DM250 efficiently completes 15 bores to 305 feet through tough, plastic clay 80 percent of the hole to install geothermal field at a large residence.

At a limited-access residential site in New York, the DM250 efficiently completes 15 bores to 305 feet through tough, plastic clay 80 percent of the hole to install geothermal field at a large residence.

Launching Island Geo Drillers in New York five years ago, Joe Dalba and partner Ryan Maletta were ready to take their closed-loop geothermal installation business to the next level. Their projects were progressing from residences with up to 50-ton fields to schools requiring 300-ton fields with 90 bores to 350 feet. Yet, they desired to go after more municipal projects. What they needed to take the next step was a new drill rig.

“We wanted to increase efficiency,” Dalba said. “We wanted to go deeper and needed more power and pull back, switching from 10-foot to 20-foot stroke to clear holes of cuttings.”

They looked at several different rigs, wanting to keep everything non-CDL.

“To get a more capable rig and take our business to the next step, DRILLMAX® DM250 [by Geoprobe®] was the only one non-CDL,” Dalba said. “Others with these capabilities required a CDL or were not yet in production, just prototypes.”

Dalba did his research, talking to other DRILLMAX® by Geoprobe® owners on the island.

“I watched videos and thought ‘it can’t be that fast’. It almost startles you,” Dalba said. “With our old rig, I’d look at the pressure gauge because I had time to, but this just happens in the blink of your eyes.”

Recently COVID-19 restrictions limited them to having just the two owners on site. Dalba and Maletta completed the 15 bores to 305 feet through tough, plastic clay 80 percent of the hole. Dalba ran the rig while Maletta worked the mud cleaner getting loops ready for installation.

“The DM250 took a beating but got right through it. We doubled our production speed with the stroke and pump,” Dalba said. “The way she forces plastic clay out of the hole was pretty unbelievable. The 20-foot stroke and speed of the tophead means it goes faster for a longer distance, good for plunging clay out of the hole.”

The pressure consistency produced by the piston pump, physical comfort created by the wide driller's platform, and production capability provided by the rod loader add to the advantages afforded by the DM250.

“It has everything really – it’s faster and lots easier,” Dalba said. “Speed of tophead rotation combined with 20-foot stroke on tight package, ramps up production, and it being non-CDL also saves on insurance.”
 

Contact Us

1835 Wall Street
Salina, KS 67401
Phone: (785) 825-1842
Fax: (352) 237-0450

DM250 Single Rod Loader

DM250 water well drill is top choice of drill rigs for tight water well drilling or residential geothermal drilling.

DM250 Drill Rig

The DRILLMAX® DM250 drill rig by Geoprobe®, under CDL requirements, handles 20-foot drill pipe for residential water well drilling and geothermal drilling. The small mud rotary drill rig is ideal for drilling 2-inch to 6-inch shallow water wells.

Photo Gallery


At a limited-access residential site in New York, the DM250 efficiently completes 15 bores to 305 feet through tough, plastic clay 80 percent of the hole to install geothermal field at a large residence.

Related Articles


Whether a veteran driller or just starting out, a factory visit provides valuable insight when making the investment required to purchase a new rig. Taking time to see firsthand how the rig you’re considering is engineered and manufactured and meeting the

ID: 218 | Date:

Getting their start in 1992 doing mostly environmental work at gas stations, SHEPLER WELL DRILLING does 75 percent environmental and 25 percent residential work. Lately a lot of their work involves production wells and recovery wells in oil fields.

ID: 217 | Date:

Four decades ago Michael Barlow began installing pumps and drilling wells with one rig. He diversified into commercial geothermal projects in the early '90s. Today MICHAEL BARLOW DRILLING & SERVICE INC. completes as much service volume as drilling. This i

ID: 215 | Date:

A third-generation company begun by her grandfather Andy Kuka 60 years ago, Danielle Gambrel took over from her father Vince Kuka when he became ill. Completing residential wells and service in Florida as SPRING HILL WELL DRILLING for the last 45 years, t

ID: 208 | Date:

As ASSOCIATED DRILLING adapts to new ownership, they’re also adapting to the smaller DM250. Calvin Piper now oversees technical work — pumps, water lines, out of water calls — while Kyler Erickson oversees drilling. This includes drilling for water well,

ID: 207 | Date: