Factory-mounted Mudslayer 250 drilling mud cleaning system
Separate Auxiliary Hydraulic Circuit
Eliminates drilling functions and fluid circulation battling for hydraulic pressure and flow. Hook up a mud cleaner or grout mixer, you're ready to go.
Factory-mounted Mudslayer 250 Mud Cleaning System
Rod Carousel and Rod Box
Carry 240-feet of 3.5-inch rods with additional 300 feet in box, using winch and jib to back feed carousel. Head shifts left or right before it reaches the top.
Contact Us
1835 Wall Street
Salina, KS 67401
Phone: (785) 825-1842
Fax: (352) 237-0450
Getting their start in 1992 doing mostly environmental work at gas stations, SHEPLER WELL DRILLING does 75 percent environmental and 25 percent residential work. Lately a lot of their work involves production wells and recovery wells in oil fields.
ID: 217 | Date: 2023-03-17
Four decades ago Michael Barlow began installing pumps and drilling wells with one rig. He diversified into commercial geothermal projects in the early '90s. Today MICHAEL BARLOW DRILLING & SERVICE INC. completes as much service volume as drilling. This i
ID: 215 | Date: 2023-03-17
SPEED PRODUCTION AND ELIMINATE BIGGER SUPPORT TRUCK WHEN CHOOSING ON-BOARD HYDRAULIC WELDER.
ID: 212 | Date: 2023-03-16
Running one legacy model DM450, family-owned DICK JOYCE WELL DRILLING found themselves looking for a solution to their lengthening list of work.
ID: 211 | Date: 2023-03-16
CREATE OPPORTUNITY TO TASK HELPER WITH OTHER SITE CHORES WHEN YOU CHOOSE CAROUSEL OPTION.
ID: 210 | Date: 2023-03-16